CLIENT:
Iluka Resources
LOCATION:
Eneabba, WA
Execution Period:
July 2024 to November 2024
Contract value:
~$0.6 million
Scope of work
The scope of work includes the design and installation of:
- Architectural works to ceilings, walls, insulation, doorways, painting and flooring (carpet and tiling) for office spaces, crib facilities, toilets and showers;
- Structural modifications, repairs & upgrades;
- A new Overhead Travelling Crane;
- All electrical and communications, liaising with the Iluka electrical and IT Infrastructure engineers;
- All services and utilities connections and tie ins, including :
- Fibre Backbone;
- Electrical works including all fittings and outlets;
- Communications works including data and display monitors;
- Fire Equipment (extinguishers, blankets, smoke alarms etc).
- Hydraulic works including:
- Waste Water, Septic and Leach Drains;
- Hot & Cold Water Services;
- Value engineering & cost effectiveness;
- Compliance with the BCA, Australian Standards, OSH legislation and all other relevant codes, standards, and by-laws.









