Projects

Sandfire Solar project

Projects

Sandfire Solar project

Projects

Sandfire Solar project

CLIENT:
Neoen
LOCATION:
Goldfields, WA
Execution Period:
Contract value:
~$40 million

Scope of work

OTOC Australia, in Joint venture with Juwi Renewable Energy, completed the turnkey EPC delivery of the DeGrussa solar power project which uses solar diesel hybrid technology to reduce both operating costs and CO2 emissions.

The innovative project was the largest integrated off-grid solar and battery storage facility in Australia.

The project included the installation of approximately 4,700 steel piles, NEXTracker tracking system and over 30,000 solar PV panels, all electrical cabling and a containerised 6MW lithium-ion battery storage facility.

Related Projects

Find out how we can service your remote infrastructure requirements

(08) 9381 2330 
info@otocaustralia.com.au

Tell us about your project, challenge or opportunity and we’ll be in touch shortly.

Great! Your message has now been sent

We couldn’t process your submission. Please retry